![]() A detailed calculation of spent fuel compositions by fuel block and particle type is being performed for better definition of process streams in a fuel reprocessing facility. ![]() These runs represented the first cycle and second uranium cycle of the acid-Thorex flowsheet. Eight solvent extraction runs were completed during the quarter. ![]() Bench-scale tests on oxidation of HTGR fuel boron carbide at 900/sup 0/C indicates that most if not all of the carbide will be converted to boron oxide in the fluidized bed burner. Two-stage leaching runs with burned-back ThC/sub 2/ indicate there are no measurable differences in total dissolution time as compared to single-stage leaching. Only minor effects were observed and reference values for facility operations were specified. So I started Steam without AVG VPN and loaded istripper. Problem is you cannot start istripper without being connected to Stream and Stream dosen't like AVG VPN. Twelve leaching runs were performed during the quarter using crushed, burned-back TRISO coated ThC/sub 2/ particles and burned-back BISO coated sol gel ThO/sub 2/ particles to examine the effect of varying the Thorex-to-thoria ratio to give product solutions ranging from 0.25M to 1M in thorium. just quit steam and reset iStripper, i also use win 7 I did a clean install on Win7 64bit with no windows (NSA) updates just drivers and AVG antivirus with free VPN. Experimental work on the 20-cm more ยป primary fluidized bed burner verified the fines recycle operating mode in runs of greater than 24 hr. ![]() Studies of flow characteristics of granular solids in pneumatic transfer systems are continuing and data are being collected for use in design of systems for solids handling. Meets ANSI Specification (B31.1) and ASME Section III Nuclear Code. Fabrication and receipt of all major components is under way, and auxiliary instrumentation and support systems are being installed. IE-114 Upfront Stripper/Cutter/Crimper, Metric 0.75-6.0 mm2 1.5-6.0 mm 1.5-6.0 mm. Design work on the multistage crushing system, the primary and secondary fluidized bed burners, the pneumatic transfer systems, and the ancillary fixtures for semiremote assembly and disassembly is essentially complete. The development program for HTGR fuel reprocessing continues to emphasize the design and construction of a prototype head-end line.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |